Coolaney Village to Rockfield National School Footpath Scheme

Open10 Apr, 2024, 11:15am - 3 May, 2024, 5:00pm

Primary tabs

Coolaney Village to Rockfield National School - Footpath Scheme

Proposed Scheme

The scheme is located along Local Road L6804-0, starting at the entrance to Fort Haven Residential Estate to Rockfield National School.

The objective of the scheme is to create a pedestrian link connecting Coolaney Village to Rockfield National School. The works involved are as follows:

  • Remove the existing road boundary along the 850 - metre stretch of the local road. 
  • Remove the existing utility poles and overhead wires.
  • Provide and construct underground utility network.
  • Extend the existing drainage network.
  • Provide and construct a 3-metre-wide sharded concrete cycleway & footpath – subject to detailed design

 

Figure 2 – Section showing footpath (Please see brochure for figure 2)

  • Provide and construct a new roadside boundary in the form of fencing and new hedgerows.
  • Provide new public lighting along the new footpath
  • Provision of pedestrian crossing facilities along the route

 

Further information: (see attached document).

In person consultation:   

Tuesday 30th April 2024 from 4pm until 7pm in Coolaney Community Centre.

 Submissions:  closing date of Friday 03rd May at 5pm via the online consultation portal or in person on Tuesday 30th April 2024 in Coolaney Community Centre

 

Submissions

Themes

Active Travel
pedestrian safety
Subscribe